Scroll down for Notices to Airmen and Construction Advisories.

Date/Time (L)

3/28/2008 –1020L

KGYY

Scroll down for a larger airport diagram

Report By:

Donnetta Whitehead

Phone

219-712-1864

Air temp.

2°C

Ground Temp

4°C

Friction Device

Used

Bowmonk AFM2 MK3

Winter Snow Removal Operations Are In Effect:   NO

Note: A closed surface will have CLOSED as a condition reported. An open surface will have Mu and condition reported

Runway

TD

MP

RO

RUNWAY CONDITIONS

 From 12

40+

40+

40+

Bare

From 2

40+ 40+ 40+ Bare

Taxiway

Mu

TAXIWAY CONDITIONS

A

40+

Bare

A-1

40+ Bare

A-2

40+ Bare

A-3

40+ Bare

A-4

40+ Bare

B

40+ Bare

B-1

40+ Bare

B-2

40+ Bare

B-3

40+ Bare

C

40+ Bare

E

40+ Bare

Apron

Mu

APRON CONDITIONS

Terminal

40+ Bare

JetSelect

40+ Bare

T-Hangars

40+ Bare

Jet Center

40+ Bare

West Ramp

40+ Bare

Boeing

40+ Bare

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

This page is designed to assist pilots in conjunction with information obtained by Lockheed Martin Flight Service

via 1-800-WX-BRIEF (800-992-7433) during the official flight planning process.

Notices to Airmen (NOTAM)

 

1.      Taxiway “D” is closed permanently.

2.      100-foot crane operating 1000 feet south of the RWY 12 threshold.

3.      75’ crane 900 feet east of the RWY 2/20 centerline, east of RWY 20 threshold.

4.      Taxiway “F” Closed.  2,522 feet from approach end of RWY 30, 220 feet  left of centerline. 

 

5.      RWY 30 ILS MM Decommissioned.

6.      Boiler Two Arrival Procedure N/A.

 

*See FCR for temporary closures (if applicable) due to snow, ice or other contaminants.

 

Airport Construction Advisories

1.     Gary Jet Center West Hangar – North edge of West Ramp – Area marked and lighted.

2.     Limited Army Aviation Support Facility – south of the approach end of RWY 12 (facility southeast of Taxiway “F”).